Earth Environmental Working With Global Manufacturer of Petrochemicals.

Our North East Office has secured a contract working with a global manufacturer of petrochemicals, specialty chemicals, and oil products

Project: New Multi-million £ chemical plant

Tender Value: £100,000+

Scope: Cable percussion boreholes to bedrock, CPT, Seismic CPT, Electrical Resistivity, Thermal Resistivity, Trial pitting, Crosshole Seismic Tests, laboratory geotechnical testing, and environmental analysis. All works had to be undertaken in an intrinsically safe environment within an existing chemical work which involved the use of specialist equipment and a lengthy permitting process. The North East team at Earth Environmental & Geotechnical are delighted to be working on this extensive project.

headoffice@earthenvironmental.co.uk

See More:- https://www.earthenvironmental.co.uk/earth-environmental-new-project-with-global-manufacturer-of-petrochemicals/



Comments

Popular posts from this blog

Basement Impact Assessment

  The  basement impact assessment (BIA) takes care of the geological and hydro geological conditions of the area and other potential risks such as drainage, flooding, groundwater quality. A Basement impact assessment (BIA) will include phase 1 desk study to verify the site's history, explore hydro-geological and conditions and surface flood risk. Basement changes can add valuable space to your property, but always ensure that the proposed basement development is appropriate. Earth Environmental & Geotechnical provides a complete Basement Impact Assessments report (BIA) to support your planning application. For more details, check:  https://www.earthenvironmental.co.uk/basement-impact-assessment/

BASEMENT IMPACT ASSESSMENT : BIA | Earth Environmental

If so then you’ll need to comply with building regulations and probably planning permission from your local authority and will probably need a Basement Impact Assessment. Basement conversions can add valuable space to your property or development, but ensuring the proposed basement development is appropriate is essential.  Your development will need to ensure, not only your local planning department are happy with your proposal, but also Building Regulations, Environmental Health standards, and Utility Provider requirements are being met.  See More:-  https://www.earthenvironmental.co.uk/basement-impact-assessment/

Phase 1 Desk Study

 The purpose of a  phase 1 desk study is to recognize the potential risks on the development site and the lack of safety measures. Phase 1 desk study provides a definitive report with a comprehensive inspection for each part of the research process. A site walkover survey would be conducted as part of each phase 1 desk study report. After that, a cost-effective site examination will be developed by gathering available data related to the site's environment, geology, hydrogeology, and mining frameworks. Explore more about the complete process:   https://www.earthenvironmental.co.uk/phase-1-desk-study/