Skip to main content

NEW MULTI-MILLION POUND CHEMICAL PLANT | Earth Environmental

Earth Environmental Working With Global Manufacturer of Petrochemicals.

Our North East Office has secured a contract working with a global manufacturer of petrochemicals, specialty chemicals, and oil products

Project: New Multi-million £ chemical plant

Tender Value: £100,000+

Scope: Cable percussion boreholes to bedrock, CPT, Seismic CPT, Electrical Resistivity, Thermal Resistivity, Trial pitting, Crosshole Seismic Tests, laboratory geotechnical testing, and environmental analysis. All works had to be undertaken in an intrinsically safe environment within an existing chemical work which involved the use of specialist equipment and a lengthy permitting process. The North East team at Earth Environmental & Geotechnical are delighted to be working on this extensive project.

headoffice@earthenvironmental.co.uk

See More:- https://www.earthenvironmental.co.uk/earth-environmental-new-project-with-global-manufacturer-of-petrochemicals/



Comments

Popular posts from this blog

Site Investigation

Site investigation is a procedure guided by strong and well-defined security practices, with site-specific objective statements and risk assessments provided. A site investigation is the initial stage in establishing an on-site investigation service. Subsurface site investigations are essential to the site's Geo-Environmental status report. It addresses any landfill/gas issue. Earth Environmental has extensive experience in geotechnical, mining, and environmental site inspections.  Visit  https://www.earthenvironmental.co.uk/site-investigation/ to learn more about our services and procedures.  https://www.earthenvironmental.co.uk/conducting-site-investigations/   

Phase 1 Desk Study

A phase 1 desk study 's primary purpose is to detect possible dangers and a lack of safety measures on the construction site. The Phase 1 desk study yields a comprehensive report which details every aspect of the research process. Each phase 1 desk research report includes a walkover survey of the site. Site examination built with existing data on the site's ecology, geology, hydrogeology, and mining frameworks.  To learn more, visit  http s://www.earthenvironmental.co.uk/phase-1-desk-study/ .

Flood Risk Assessment

The term " flood risk assessment " (FRA) refers to a process that identifies the potential causes, severity, and necessary mitigation measures for floods. Flood zones 1–3 defined the strategic flood risk assessment. The scope and parameters of the flood risk assessment will depend on the development site's area and terrain. Flood Risk Assessments are conducted for a variety of places in order to meet local planning requirements and to follow the advice and guidance of the Environment Agency and the National Planning Policy Framework. Want to know more about the entire procedure:  https://www.earthenvironmental.co.uk/flood-risk-assessment/   https://www.earthenvironmental.co.uk/do-i-need-a-flood-risk-assessment/