Skip to main content

Flood Risk Assessments | Earth Environmental

The minimum Flood Risk Assessment we provide that is required for most planning approvals is for sites that are more than 1 hectare in size and lie within Flood Zone 1.

See More:- https://goo.gl/jW6GS7



Comments

  1. These types of suggestions are very useful to me. You are providing good knowledge of Flood Risk Assessment. Thank You for sharing wonderful Blog

    ReplyDelete

Post a Comment

Popular posts from this blog

Basement Impact Assessment

  The  basement impact assessment (BIA) takes care of the geological and hydro geological conditions of the area and other potential risks such as drainage, flooding, groundwater quality. A Basement impact assessment (BIA) will include phase 1 desk study to verify the site's history, explore hydro-geological and conditions and surface flood risk. Basement changes can add valuable space to your property, but always ensure that the proposed basement development is appropriate. Earth Environmental & Geotechnical provides a complete Basement Impact Assessments report (BIA) to support your planning application. For more details, check:  https://www.earthenvironmental.co.uk/basement-impact-assessment/

BASEMENT IMPACT ASSESSMENT : BIA | Earth Environmental

If so then you’ll need to comply with building regulations and probably planning permission from your local authority and will probably need a Basement Impact Assessment. Basement conversions can add valuable space to your property or development, but ensuring the proposed basement development is appropriate is essential.  Your development will need to ensure, not only your local planning department are happy with your proposal, but also Building Regulations, Environmental Health standards, and Utility Provider requirements are being met.  See More:-  https://www.earthenvironmental.co.uk/basement-impact-assessment/

Phase 1 Desk Study

 The purpose of a  phase 1 desk study is to recognize the potential risks on the development site and the lack of safety measures. Phase 1 desk study provides a definitive report with a comprehensive inspection for each part of the research process. A site walkover survey would be conducted as part of each phase 1 desk study report. After that, a cost-effective site examination will be developed by gathering available data related to the site's environment, geology, hydrogeology, and mining frameworks. Explore more about the complete process:   https://www.earthenvironmental.co.uk/phase-1-desk-study/