As part of the remediation strategy for a new retail park shallow ground contamination was also found associated with heavy metals, rendering the surface scrape material as hazardous, if removed offsite to a landfill facility. Click here: https://goo.gl/CrvjRy
In the UK a brownfield site is defined as “previously developed land” that has the potential for being redeveloped. It is often (but not always) land that has been used for industrial and commercial purposes and is now derelict and possibly contaminated. Most of the land that was once used for industry in this country laid redundant for many years. But where demand for residential and commercial property is high, and available green spaces are low, brownfield sites have become an increasingly popular development opportunity. Brownfield land is seen as a great development option and everyone is keen to see brownfield sites brought back to life. See More:- https://www.earthenvironmental.co.uk/development-of-brownfield-sites/
Plate Bearing Test is normally carried out at the foundation level, either on the surface or in a shallow pit. Plates of varying sizes up to 720mm diameter are available. Click here: https://goo.gl/tsZz2i
A site investigation was triggered to assess ground conditions on part of the former BICC Cable Works and on an adjacent former sewage work. Several phases of site investigation have been conducted with the development of a Remediation Strategy. Click here: http://bit.ly/2GGHKYY
This will be the most detailed flood risk assessment required to obtain planning permission for a development, and the steps below are to be taken as a minimum. See More:- https://bit.ly/2Y1tG69
A site investigation was considered necessary to assess ground conditions for the route of the diverted cable beneath the River Lune. Read More: http://bit.ly/2PyzDRk
The sandstone bedrock was photographed, described in accordance with BS5930 2015, sampled and tested in the laboratory to provide a complete picture of the ground conditions and potential risks to the scheme. See More:- https://bit.ly/2TXNnKS
Landfill permitting and design requires a multidisciplinary approach involving geotechnical engineering, geology, construction quality, civil engineering, and hydrogeology and risk management. See More:- https://goo.gl/uAE8KB
A site investigation found a hydrocarbon impacted benzene plume along the site frontage, though to be associated with a former tank farm. There were no records relating to the operation or decommissioning of the site. Visit here:- http://bit.ly/2vnnIfH
Brownfield Land Register - The purpose of the register is to provide up-to-date and consistent information on sites that are considered by Local Authorities to be appropriate for residential development. See More:- https://bit.ly/2JwheSl
As part of the construction work, staff will supervise the placement of a new capping horizon and monitor the working environment, for possible asbestos dust in the air. . Visit here: https://goo.gl/Dqb7YH
We have extensive experience in the assessment of ground conditions for the design of new structures buildings, retaining wall, and highway/pavement design . See More:- https://goo.gl/Sr18kn
The minimum Flood Risk Assessment we provide that is required for most planning approvals is for sites that are more than 1 hectare in size and lie within Flood Zone 1. See More:- https://goo.gl/jW6GS7
Landfill permitting and design requires a multidisciplinary approach involving geotechnical engineering, geology, construction quality, civil engineering, and hydrogeology and risk management. See More:- https://goo.gl/uAE8KB
We provided a topographic and river hydrographic survey and completed a comprehensive Health and Safety Plan, Method Statements and Risk Assessments. Click here: https://goo.gl/SsLjWi
As part of the remediation strategy for a new retail park shallow ground contamination was also found associated with heavy metals, rendering the surface scrape material as hazardous, if removed offsite to a landfill facility. Click here: https://goo.gl/CrvjRy
The sandstone bedrock was photographed, described in accordance with BS5930 2015, sampled and tested in the laboratory to provide a complete picture of the ground conditions and potential risks to the scheme. . See More:- https://bit.ly/2TXNnKS
A site investigation on a site in Liverpool found concentrations of hydrocarbons in shallow groundwater, in excess of water quality standards. The benzene concentration in the core of the plume was 1810ug/liter and is thought to have originated from a former fuel retailing facility. Read more: https://www.earthenvironmental.co.uk/remediation-of-groundwater-liverpool/
Our staff has many years of experience of advising the insurance sector on ground conditions as part of structural survey work or assessment of contamination issues. For more information click here:- https://goo.gl/ynXn9V
The sandstone bedrock was photographed, described in accordance with BS5930 2015, sampled and tested in the laboratory to provide a complete picture of the ground conditions and potential risks to the scheme. . See More:- https://bit.ly/2TXNnKS
A site investigation found a hydrocarbon impacted benzene plume along the site frontage, though to be associated with a former tank farm. There were no records relating to the operation or decommissioning of the site. Visit here:- http://bit.ly/2vnnIfH
Brownfield Land Register - The purpose of the register is to provide up-to-date and consistent information on sites that are considered by Local Authorities to be appropriate for residential development. See More:- https://bit.ly/2JwheSl